Laying Out An Install

Here is a simple video looking out the basic layout of a 350′ job.

As you can see with the 350′ job, we used:
– 3 Lines
– Controller
– Power Supply

The 3 Lines
– Lower Roof Line
– Upper Roof Line
– 2nd Floor Pop out

It is important to know the limitations of your system.
– Lents of Jumps (what length requires a transmitter and/or a receiver
– The length of each line
– The limitations of the control box

Maximum length with one line is 250′
Maximum length with 2 lines, each at 150′ is 300′ A system with a controller and power supply, should not exceed 500′ to 600′ depending on the configuration.

3 lines.

Leave a Reply

Your email address will not be published. Required fields are marked *